Project information
- Category: Microgrid Project
- Region & Country: Switzerland, Europe
- Client: Vegetable Processing Factory
- Project Configuration: 200kW/465.92kWh BESS + EMS + Existing Solar System
- Project Time: 2024
- Applied Solution: Commercial and Industrial
- Applied EMS: EMS Controller Set
- Applied BESS : EGS215 Cabinet
- Applied Service : Engineering, Consultancy
- Applied Logics: Peak Shaving (no more than **kW power from grid to prevent high electricity rate and save extra solar energy into the BESS) and Load Shifting